Translations:Training and Facilitation Guide/2/en: Perbedaan revisi

(Importing a new version from external source)
 
(Importing a new version from external source)
 
Baris 1: Baris 1:
 
===Preparation on arrival===
 
===Preparation on arrival===
'''By the kabupaten coordinator and an experienced user such as a Champion or a coordinator visiting from an iSIKHNAS active area.'''   
+
'''New kabupaten coordinators are required to prepare for staff training together with the Provincial coordinator and an experienced user such as a Champion or a coordinator visiting from an iSIKHNAS active area.'''   
 
*Staff should be pre-registered to use the system before the start of the training to avoid time losses in the registration process.  Website registrations should include,
 
*Staff should be pre-registered to use the system before the start of the training to avoid time losses in the registration process.  Website registrations should include,
 
**Mobile phone number/s and email
 
**Mobile phone number/s and email

Revisi terkini pada 25 Agustus 2014 12.32

Informasi pesan (berkontribusi)

Pesan ini tidak memiliki dokumentasi. Jika Anda tahu di mana dan bagaimana pesan ini digunakan, Anda dapat membantu penerjemah lain dengan menambahkan dokumentasi untuk pesan ini.

Definisi pesan (Training and Facilitation Guide)
===Preparation on arrival===
'''New kabupaten coordinators are required to prepare for staff training together with the Provincial coordinator and an experienced user such as a Champion or a coordinator visiting from an iSIKHNAS active area.'''  
*Staff should be pre-registered to use the system before the start of the training to avoid time losses in the registration process.  Website registrations should include,
**Mobile phone number/s and email
**Registered work location to desa level, could also add infrastructure as additional work location if desired
**User type set with care because many permissions are dependent on user type.
**Area of responsibility established
**Permissions set
**Alert switches set
*Infrastructure is checked and entered if not already listed – abattoirs, dinas offices, labs, and others
*Location codes for the area are checked – names, kecamatan, kabupaten.  Adjustments will have to be noted for later – when the interface is able to handle making changes of this type.  Local location code list should be created and printed for staff training.  See attached
Terjemahan===Preparation on arrival===
'''New kabupaten coordinators are required to prepare for staff training together with the Provincial coordinator and an experienced user such as a Champion or a coordinator visiting from an iSIKHNAS active area.'''  
*Staff should be pre-registered to use the system before the start of the training to avoid time losses in the registration process.  Website registrations should include,
**Mobile phone number/s and email
**Registered work location to desa level, could also add infrastructure as additional work location if desired
**User type set with care because many permissions are dependent on user type.
**Area of responsibility established
**Permissions set
**Alert switches set
*Infrastructure is checked and entered if not already listed – abattoirs, dinas offices, labs, and others
*Location codes for the area are checked – names, kecamatan, kabupaten.  Adjustments will have to be noted for later – when the interface is able to handle making changes of this type.  Local location code list should be created and printed for staff training.  See attached

Preparation on arrival

New kabupaten coordinators are required to prepare for staff training together with the Provincial coordinator and an experienced user such as a Champion or a coordinator visiting from an iSIKHNAS active area.

  • Staff should be pre-registered to use the system before the start of the training to avoid time losses in the registration process. Website registrations should include,
    • Mobile phone number/s and email
    • Registered work location to desa level, could also add infrastructure as additional work location if desired
    • User type set with care because many permissions are dependent on user type.
    • Area of responsibility established
    • Permissions set
    • Alert switches set
  • Infrastructure is checked and entered if not already listed – abattoirs, dinas offices, labs, and others
  • Location codes for the area are checked – names, kecamatan, kabupaten. Adjustments will have to be noted for later – when the interface is able to handle making changes of this type. Local location code list should be created and printed for staff training. See attached